Leaks or moisture below
Water can enter through failed membranes, thresholds, drains, joints or wall connections.
TERRACE RENOVATION MALLORCA
EcoViva coordinates terrace and balcony renovation from diagnosis and waterproofing through drainage, finishes and completion.
WHEN TO CONTACT US
Water can enter through failed membranes, thresholds, drains, joints or wall connections.
Insufficient falls or poorly positioned outlets keep water on the terrace and stress the waterproofing.
Heat, movement, weak substrates and incompatible layers can damage tiles, joints and edges.
SOLUTIONS
The membrane and detailing are selected according to substrate, use, access and existing construction.
Slopes, outlets, overflows and thresholds provide a controlled route for intense rainfall.
Tiles, stone, microcement or other suitable finishes are coordinated with movement joints and the layers below.
Built for Mallorca sun and sudden rainfall.
Strong UV exposure, heat and short periods of heavy rain test every terrace detail. Drainage, thresholds, wall connections and compatible materials matter as much as the visible surface.
Share the location, terrace, visible damage and any interior moisture.
We review falls, drains, thresholds, substrate, waterproofing and adjoining walls.
The build-up, details, finish and coordinated proposal are agreed before work starts.
Specialists complete the work while EcoViva follows the critical details and handover.
Sometimes, when the defect is isolated and the surrounding build-up remains sound. The source must be identified first.
No. The waterproofing, falls, drainage and junctions below the visible finish must work together.
It may be possible depending on levels, thresholds, use and the existing construction.
Yes. We coordinate balconies, terraces and accessible flat-roof areas when the complete water-management scope can be defined.
MARKUS & MARITZA
Send the location, photos and a short description of leaks, drainage or the desired finish. We will advise the appropriate assessment.